Pembroke Pines Recertification Submission
Pembroke Pines requires all 40‑ and 50‑Year Recertification reports to be submitted electronically through the city’s online permitting portal (Development HUB / EnerGov). Paper copies are no longer accepted.
Step‑by‑Step Instructions
Create or Log In
Go to the Pembroke Pines Development HUB (EnerGov) portal and log in or create an account. This account will be used to upload your recertification documents and track the review process. Access the portal.
Prepare Required Documents
Make sure you have the following PDFs ready:
• Building Safety Inspection Submittal Form
• Structural Inspection Report
• Electrical Inspection Report
• Any required attachments or additional documentation
Upload Documents Online
In the Development HUB, upload each document separately into the correct category. Clearly name each file so the city reviewer can easily identify them.
Pay Review Fee
Pay the applicable administrative review fee (typically around $138.24 per report) through the portal during the submission process.
Address Repairs (if needed)
If the engineer identifies required repairs, obtain the necessary permits through the Development HUB for each discipline (structural, electrical, etc.) and upload updated reports once work is complete.
Monitor Submission
Track your submission status in the Development HUB. Respond promptly to any review comments or requests for resubmittal.
Keep Records
Once your submission is approved, save or print the approval confirmation and fee receipt. This serves as proof of compliance with the safety inspection program.
Address: 601 City Center Way, Pembroke Pines, FL 33025
Phone: (954) 435‑6502
Email: pinespermits@cgasolutions.com
Visit the Building Department Page

